- Page 1 and 2:
IAEA HumAn HEAltH SErIES no. 4 Comp
- Page 3 and 4:
COMPREHENSIVE CLINICAL AUDITS OF DI
- Page 5 and 6:
IAEA HUMAN HEALTH SERIES No. 4 COMP
- Page 7 and 8:
FOREWORD The application of radiati
- Page 9 and 10:
CONTENTS 1. INTRODUCTION . . . . .
- Page 11 and 12:
5.1.3. Quality assurance processes
- Page 13 and 14:
1. INTRODUCTION 1.1. CLINICAL AUDIT
- Page 15 and 16:
1.1.3. Confidentiality of audits Co
- Page 17 and 18:
evidence based medical research is
- Page 19 and 20:
As a result of the comprehensive cl
- Page 21 and 22:
The facility/institution is respons
- Page 23 and 24:
2.4.2. Review The review process wi
- Page 25 and 26:
2.5.1. Title page and contents page
- Page 27 and 28:
2.6. DISSEMINATION OF THE REPORT Th
- Page 29 and 30:
A QA committee should be establishe
- Page 31 and 32:
Lines of authority should be reflec
- Page 33 and 34:
—Medical support equipment such a
- Page 35 and 36:
(g) (h) (i) Make an assessment of t
- Page 37 and 38:
(c) (d) (e) (f) Examine the facilit
- Page 39 and 40:
(c) (d) Consider policy in regard t
- Page 41 and 42:
equire a written policy and procedu
- Page 43 and 44:
Once examination scheduling has bee
- Page 45 and 46:
Documentation of the details of the
- Page 47 and 48:
There should be a radiographer resp
- Page 49 and 50:
—Recorded; —Systematically eval
- Page 51 and 52:
4.2.1.5. Pre-procedure screening an
- Page 53 and 54:
(f) (g) (h) (i) (j) (k) (l) (m) (n)
- Page 55 and 56:
4.2.5. Report communication The aud
- Page 57 and 58:
—Digital image receptors (compute
- Page 59 and 60:
(b) (c) (d) Ensuring that appropria
- Page 61 and 62:
5.1.2.2. Occupational and public ex
- Page 63 and 64:
(f) (g) Performance criteria for al
- Page 65 and 66:
Dosimetry for those subjected to ra
- Page 67 and 68:
5.2.1.3. Management support The aud
- Page 69 and 70:
(b) (c) Discuss the facility’s po
- Page 71 and 72:
(g) (h) (i) Discuss with the medica
- Page 73 and 74:
Professionals engaging in such prog
- Page 75 and 76:
6.2. THE AUDIT PROGRAMME 6.2.1. Edu
- Page 77:
(d) (v) Regularity of research meet
- Page 80 and 81:
Six months before audit Audited ins
- Page 82 and 83:
Day 1: Morning: All audit team memb
- Page 84 and 85:
Appendix III AUDIT REPORT FORMAT: S
- Page 86 and 87:
Appendix IV AUDIT REPORT FORMS The
- Page 88 and 89:
Audit criteria Adequacy Comments Su
- Page 90 and 91:
Audit criteria Adequacy Comments Su
- Page 92 and 93:
Audit criteria Adequacy Comments Su
- Page 94 and 95:
Audit criteria Adequacy Comments Su
- Page 96 and 97:
Audit criteria Adequacy Comments Su
- Page 98 and 99:
Audit criteria Adequacy Comments Su
- Page 100 and 101: Audit criteria Adequacy Comments Su
- Page 102 and 103: Audit criteria Adequacy Comments Su
- Page 104 and 105: Audit criteria Adequacy Comments Su
- Page 106 and 107: Audit criteria Adequacy Comments Su
- Page 108 and 109: Audit criteria Adequacy Comments Su
- Page 110 and 111: Audit criteria Adequacy Comments Su
- Page 112 and 113: Audit criteria Adequacy Comments Su
- Page 114 and 115: Audit criteria Adequacy Comments Su
- Page 116 and 117: Audit criteria Adequacy Comments Su
- Page 118 and 119: Audit criteria Adequacy Comments Su
- Page 120 and 121: 5.3. AUDIT REPORT FORMS FOR TECHNIC
- Page 122 and 123: Audit criteria Adequacy Comments Su
- Page 124 and 125: Audit criteria Adequacy Comments Su
- Page 126 and 127: Audit criteria Adequacy Comments Su
- Page 128 and 129: Audit criteria Adequacy Comments Su
- Page 130 and 131: Audit criteria Adequacy Comments Su
- Page 132 and 133: Audit criteria Adequacy Comments Su
- Page 134 and 135: Audit criteria Adequacy Comments Su
- Page 136 and 137: 6.3. AUDIT REPORT FORMS FOR EDUCATI
- Page 138 and 139: Audit criteria Adequacy Comments Su
- Page 140 and 141: Audit criteria Adequacy Comments Su
- Page 142 and 143: Audit criteria Adequacy Comments Su
- Page 144 and 145: Appendix V NOTES ON PHYSICIST MEASU
- Page 146 and 147: V.2.3. Other measurements The other
- Page 148 and 149: [16] COMMISSION OF THE EUROPEAN COM
- Page 152 and 153: Other department to be involved in
- Page 154 and 155: Annual number of procedures by moda
- Page 156 and 157: MRI PET/CT Image guided procedures
- Page 158 and 159: II-1.4. Calibration of instrumentat
- Page 160 and 161: FORM FOR A RADIOGRAPHIC X RAY FACIL
- Page 162 and 163: Form RXR — Items to be reviewed b
- Page 164 and 165: FORM FOR A FLUOROSCOPIC AND/OR INTE
- Page 166 and 167: Form FIF — Items to be reviewed b
- Page 168 and 169: Form MAM — Items to be reviewed b
- Page 170 and 171: FORM FOR A COMPUTED TOMOGRAPHY QA P
- Page 172 and 173: Form CTQ — Items to be reviewed b
- Page 174 and 175: Form SFP — Items to be reviewed b
- Page 176 and 177: Form CDR — Items to be reviewed b
- Page 178 and 179: FORM FOR A VIEWING CONDITIONS (DIGI
- Page 180 and 181: FORM FOR A QA PROGRAMME FOR DENTAL
- Page 182 and 183: Form DPQ — Items to be reviewed b
- Page 184 and 185: Form UQP — Items to be reviewed b
- Page 186 and 187: Form MRI — Items to be reviewed b
- Page 188 and 189: Annex IV WORKSHEET FORMS FOR PHYSIC
- Page 190 and 191: DETERMINATION OF INCIDENT AIR KERMA
- Page 192 and 193: K i Patient: Radiographic Calculati
- Page 194 and 195: Phantom: Fluoro 1 DETERMINATION OF
- Page 196 and 197: 4. Dosimeter reading and calculatio
- Page 198 and 199: P KA Patient: Fluoro 2 3. KAP readi
- Page 200 and 201:
Phantom: MGD 2 3. Mean glandular do
- Page 202 and 203:
3. CT air kerma index C a,100 Phant
- Page 204 and 205:
Annex V CONTENTS OF THE ATTACHED CD
- Page 207 and 208:
No. 21, July 2006 Where to order IA
- Page 209:
Currently there is great interest i