The report should summarize the auditors’ assessment of the overall quality<br />
of patient care at the facility/institution and their vision for the future.<br />
2.4.3. Exit briefing<br />
At the completion of the audit visit, a meeting will be convened of facility/<br />
institution officials, appropriate members from all relevant facilities and the audit<br />
team, to conduct an interactive exit briefing. It is the prerogative of the facility/<br />
institution to determine which staff members attend the meeting. This meeting<br />
should allow enough time for the following activities:<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
Presentation by the auditors of the draft audit report, including the<br />
preliminary findings and recommendations.<br />
Discussion of the report. The institution and facility members should be<br />
strongly encouraged to clarify any issues they consider may have been<br />
misunderstood by the auditors.<br />
Discussion by the audit team of the action plans for any recommendations,<br />
particularly those that may be urgent in nature.<br />
Confirmation by the audit team of the time-frame for receiving the final<br />
report.<br />
A written summary of the draft report may be left with the facility/<br />
institution. Copies of completed forms, calculations performed and the results of<br />
essential measurements carried out as part of the audit should be left with the<br />
facility/institution.<br />
2.5. THE AUDIT REPORT<br />
The audit team will prepare the finalized draft report discussed during the<br />
exit briefing with the facility/institution. At all times the audit report will be<br />
confidential and available only to clearly designated recipients and the auditing<br />
body.<br />
The report will be reviewed by the auditing body, which will discuss the<br />
contents of the report with the auditors and, if required, with the facility/<br />
institution. Once the report has been completed and approved by the audit team<br />
and auditing body, it will be disseminated. The document template for the audit<br />
report should follow the headings of Sections 2.5.1–2.5.6.<br />