Project Final Report – CUDBF April 30 th , 2009<br />
ASEN 4028: <strong>Aerospace</strong> <strong>Senior</strong> <strong>Projects</strong><br />
project’s manufacturing and testing phases. Subsystem technical leads were chosen based on<br />
experience and interest in the given field.<br />
14.2 Work Breakdown Structure<br />
The breakdown of each subsystem’s work structure was determined based on technical<br />
responsibility. The program manager and system engineer focused on team organization and<br />
subsystem integration, respectively. Each subsystem has specific technical objectives which<br />
must be researched and designed to. The technical subsystems communicated with each other<br />
with the assistance of the project manager and systems engineer. Figure 141 is a diagram of this<br />
project’s work breakdown structure.<br />
Figure 141: Work Breakdown Structure<br />
14.3 Construction and Testing Schedule Analysis<br />
At the end of the fall semester, a detailed construction and testing schedule was drafted in order<br />
to organize the team towards completing the major goals of this project. In hindsight, the<br />
predicted schedule and actual schedule differd greatly. Both the actual and predicted timelines<br />
can be seen in Figure 142.<br />
155