Project Final Report – CUDBF April 30 th , 2009<br />

ASEN 4028: <strong>Aerospace</strong> <strong>Senior</strong> <strong>Projects</strong><br />

Figure 142: Predicted (Black) and Actual (Blue) Schedule<br />

14.3.1 Buff-2A Construction and Testing Schedule<br />

The aerodynamic model, the Buff-2A, was constructed and test flown on time. Due to the time<br />

required to make numerous nose gear repairs, the duration of the Buff-2A’s flight testing was<br />

carried out longer than originally anticipated. The tests that the team wished to complete with<br />

the Buff-2A therefore extended past its predicted time and the work spent on repairs caused<br />

delays for other aspects of the project.<br />

14.3.2 Buff-2B Construction and Testing Schedule<br />

The initial construction of the Buff-2B was delayed for two reasons. First, the numerous repairs<br />

to the Buff-2A drew attention away from early construction on the Buff-2B. Second, the foam<br />

cores, which initially were to be ordered before the Winter Break, were instead ordered after.<br />

Waiting for these materials to arrive delayed the start of construction. The construction duration<br />

also took longer than anticipated. It was originally assumed that lessons learned from the<br />

aerodynamic model would allow the construction of the Buff-2B to be faster. Instead,<br />

construction techniques needed to be learned in order to construct the elements not included in<br />

the Buff-2A. This led to a much longer construction time than originally expected and thus<br />

delayed the flight schedule.<br />

14.3.3 Buff-2C Construction and Testing Schedule<br />

The construction of the Buff-2C was delayed due to the delay of the Buff-2B. The construction<br />

duration of the Buff-2C was similar to the predicted duration. This unfortunately left little test<br />

flight time for the Buff-2C before competition.<br />

14.4 Project Budget Analysis<br />

The overall project budget was estimated from past projects as well as quotes provided by<br />

suppliers. The budget was divided into two equally important components of aircraft<br />

construction and travel as both are needed for the project.<br />