30.01.2015 Views

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I/I En<strong>for</strong>cement Flow Chart<br />

A property owner violates Section 3.3.6 of the Wastewater<br />

Rules & Regulations<br />

A Notice of Violation is sent to the<br />

property owner requesting<br />

acknowledgment <strong>and</strong> a meeting<br />

Property Owner shall notify the County within 14<br />

days acknowledging receipt of the Notice of Violation<br />

Property Owner shall, within 30 days after acknowledging<br />

receipt of the Notice of Violation, meet with the Sanitary<br />

Engineer to discuss the Notice of Violation <strong>and</strong> remedial<br />

action to be taken<br />

Failure to comply will result in the property<br />

being declared a nuisance <strong>and</strong> Ottawa<br />

County shall take appropriate action to <strong>for</strong>ce<br />

correction, disconnection, restriction, or<br />

other appropriate relief<br />

Property Owner shall employ a professional engineer to<br />

prepare a SSES report within 60 days after acknowledging<br />

receipt of the Notice of Violation<br />

Property Owner shall submit an Infiltration/Inflow<br />

Remediation Plan prepared by a professional engineer<br />

within 150 days after receipt of the Notice of Violations<br />

Remediation Plan approved<br />

County reviews plan<br />

Remediation Plan NOT<br />

approved<br />

Property Owner shall submit to the Ohio<br />

EPA detailed plans requesting a permit<br />

to install <strong>and</strong> apply <strong>for</strong> a repair permit<br />

from the Ottawa County Sanitary<br />

Engineering Dept.<br />

County issues comments<br />

<strong>and</strong> requests revised plan<br />

within an approved<br />

timeframe.<br />

Property Owner shall have the Remediation<br />

Plan completed within 90 days from the date<br />

the County Permit is issued<br />

Property Owner may<br />

enter into an agreement<br />

to participate in a<br />

Material Replacement<br />

Program<br />

Revised Plan<br />

received <strong>and</strong><br />

approved<br />

Plan NOT received<br />

within approved<br />

timeframe<br />

Remediation Plan completed, inspected, <strong>and</strong><br />

approved by the Sanitary Engineer<br />

County remonitors <strong>and</strong><br />

Infiltration/Inflow is eliminated<br />

Property considered in current compliance<br />

County remonitors <strong>and</strong><br />

Infiltration/Inflow<br />

persists<br />

Property Owner per<strong>for</strong>ms<br />

additional approved<br />

corrective work<br />

Property declared a nuisance <strong>and</strong><br />

County takes appropriate action to<br />

<strong>for</strong>ce correction, disconnection,<br />

restriction, or other appropriate<br />

relief

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!