30.01.2015 Views

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

of the total <strong>wastewater</strong> loading of the treatment works. Factors such as<br />

strength, volume, <strong>and</strong> delivery flow rate characteristics shall be included to<br />

ensure a proportional distribution of the costs.<br />

3.11.3 The Sanitary Engineer may establish additional classes as determined<br />

to be necessary.<br />

3.11.4 Charges <strong>for</strong> <strong>wastewater</strong> treatment service shall be paid by each user<br />

connected or required to be connected to the <strong>wastewater</strong> treatment systems<br />

<strong>and</strong> shall be computed in accordance with the probable dem<strong>and</strong> a user<br />

places on the <strong>wastewater</strong> treatment system by assignment of an<br />

equivalency factor. The probable flow rate dem<strong>and</strong> that users place on the<br />

<strong>wastewater</strong> treatment system is correlated to the dem<strong>and</strong> expected by a<br />

single-family dwelling by the use of equivalency factors as shown on the<br />

following pages. Equivalency factors <strong>for</strong> types of users not listed shall be<br />

determined by the Sanitary Engineer on an individual basis:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!