30.01.2015 Views

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.10.0 FEES AND CHARGES<br />

All applicable fees <strong>and</strong> charges shall be due-in-full upon submittal of an<br />

application <strong>for</strong> permit or request <strong>for</strong> said services. Residential property<br />

owners current on property taxes (no past due amount) <strong>for</strong> the parcel(s)<br />

connecting to public sanitary <strong>sewer</strong> <strong>and</strong> water may defer payment of<br />

connection charges (Danbury Twp.), equalization assessment fees, <strong>and</strong><br />

equalization capital charges (PCI-Sewer) until initial water usage or certified<br />

occupancy, whichever occurs first. The deferment charge is equal to<br />

$125.00 per E.D.U. The property owner shall also enter into a ‘Connection<br />

Charges Deferral Agreement’ located in Appendix C of the Public Water<br />

Rules <strong>and</strong> Regulations. Failure to pay applicable connection charges,<br />

equalization assessment fees, <strong>and</strong> equalization capital charges prior to<br />

water usage or certified occupancy, whichever occurs first, shall result in the<br />

assessment of a ten percent (10%) penalty of the delinquent connection <strong>and</strong><br />

equalization fees. For delinquent charges, the County reserves the right to<br />

(a.) certify any <strong>and</strong> all delinquent charges plus an administrative processing<br />

fee pursuant to the <strong>county</strong> <strong>sewer</strong> <strong>district</strong>’s <strong>rules</strong> <strong>and</strong> <strong>regulations</strong> to the<br />

County Auditor <strong>for</strong> placement upon the real property tax list <strong>and</strong> duplicate<br />

against the property to which the charges apply; (b.) collect the unpaid<br />

charges by actions at law in the name of the County from the Property<br />

Owner; (c.) terminate service <strong>for</strong> the particular property until the unpaid<br />

charges are paid in-full. Permit fees <strong>and</strong> inspection fees shall be paid in full<br />

by the property owner at the time of application <strong>for</strong> permit.<br />

3.10.1 Permit Fees <strong>for</strong> All Sewer Sub-Districts:<br />

a. PERMIT FEE: $ 25.00<br />

b. REPAIR PERMIT FEE: $ 25.00<br />

c. PERMIT RENEWAL FEE: $ 25.00<br />

d. INCREASED PERMIT FEE: $ 31.00/month on a<br />

prorated basis<br />

(PORTAGE/CATAWBA ISLAND SEWER DISTRICT ONLY)<br />

Explanation of Permit Fees:<br />

a. A permit fee shall be charged <strong>for</strong> every new permit to connect (or install)<br />

issued. If more than one structure on a property is connecting to the<br />

<strong>sewer</strong> at the same time, only one permit needs to be issued <strong>for</strong> the<br />

property (only one permit fee required).<br />

b. A repair permit fee shall be charged <strong>for</strong> each repair permit issued. If the<br />

property owner is replacing, deleting, or adding less than one (1) length<br />

of pipe, testing may not be required if the inspector deems it<br />

unnecessary.<br />

c. A permit renewal fee shall be charged when an original permit has<br />

expired <strong>and</strong> the work has not been completed. A renewed permit shall<br />

be issued upon application <strong>and</strong> payment <strong>for</strong> a permit renewal <strong>and</strong> other<br />

equalization fees or charges, if applicable.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!