30.01.2015 Views

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.7.8 The issuance of a permit to connect or repair by the Sanitary Engineering<br />

Department does not relieve the permit holder of the responsibility of<br />

securing permits from the proper governmental or private agencies <strong>for</strong> the<br />

permission to work in public or private rights of way or easement areas.<br />

3.7.9 Applications <strong>for</strong> installation of sanitary <strong>sewer</strong> mains <strong>and</strong> appurtenances <strong>for</strong><br />

new subdivisions, sanitary <strong>sewer</strong> extensions, or any special project shall be<br />

made on a special <strong>for</strong>m furnished by the Sanitary Engineering Department.<br />

The application shall be signed by the property owner, developer, or<br />

president of the corporation.<br />

A permit shall not be issued until all applicable plans/specifications,<br />

easements, approvals, general requirements, <strong>and</strong> fees <strong>and</strong> charges have<br />

been submitted. All applicable fees <strong>and</strong> charges shall be paid at the time<br />

application is made <strong>for</strong> a permit.<br />

SPECIAL PROJECTS<br />

APPLICABLE FEES PER PHASE OF CONSTRUCTION (all <strong>sewer</strong> sub<strong>district</strong>s):<br />

Permit Fee<br />

Plan Review/Inspection Fee Deposit<br />

Connection Charges, Equalization Assessment Fees, Tap-In Fees, Unit<br />

Sewer Service Charges, <strong>and</strong>/or Equalization Capital Charges shall be due<br />

upon application <strong>for</strong> permit when private collection <strong>sewer</strong>s on private<br />

property are being installed <strong>and</strong> when structures are being connected at the<br />

same time. Sanitary <strong>sewer</strong>s being dedicated to the County <strong>and</strong> do not have<br />

structures being connected at the same time shall only initially be charged a<br />

permit fee <strong>and</strong> all inspection costs <strong>for</strong> the <strong>sewer</strong> main improvements.<br />

(See Section 3.10.0 <strong>for</strong> a current list of fees <strong>and</strong> charges)<br />

3.7.10 Applications <strong>for</strong> installation or repair of building <strong>sewer</strong>s shall be made on a<br />

special <strong>for</strong>m furnished by the Sanitary Engineering Department.<br />

Applications <strong>for</strong> permit shall be signed by the property owner. Applications<br />

<strong>for</strong> a repair permit or a permit renewal may be signed by the property<br />

owner's contractor or agent. A permit shall not be issued until all applicable<br />

plans/specifications, easements, approvals, general requirements, <strong>and</strong> fees<br />

<strong>and</strong> charges have been submitted.<br />

APPLICABLE FEES PER STRUCTURE CONNECTING:<br />

Permit Fee (all <strong>sewer</strong> sub-<strong>district</strong>s)<br />

Inspection Fee (all <strong>sewer</strong> sub-<strong>district</strong>s)<br />

Tap-In Fee (Salem Sewer Sub-District)<br />

Connection Charge (Danbury Township Sewer Sub-District #7)<br />

Unit Sewer Service Charge (Allen-Clay Sewer Sub-District #13)<br />

Equalization Assessment Fee (Portage/Catawba Isl<strong>and</strong> Sewer Sub-<br />

District)<br />

Equalization Capital Charge (Portage/Catawba Isl<strong>and</strong> Sewer Sub-<br />

District)<br />

Agricultural Deferrment paybacks (all <strong>sewer</strong> sub-<strong>district</strong>s)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!