4. .4 lot is non-buildable if there is a lack of frontage to build on compared to the<br />

zoning <strong>regulations</strong> <strong>for</strong> the same subdivision. The following is an example of<br />

this rule:<br />

a. Case - A particular subdivision has a typical lot width of 50 feet. There is a<br />

50 foot lot located between two (2) of the 50 foot lot owners which was split<br />

in half. Both owners, who are adjacent to the split lot, own 25 feet of the<br />

lot which was split.<br />

ASSESSMENT METHOD: The lot having 25 foot frontage does not have<br />

sufficient frontage to build on in accordance with the zoning <strong>regulations</strong><br />

<strong>for</strong> that subdivision. One of the adjacent owners has a house on his 50 foot<br />

lot. We combine the non-buildable 25 feet with the 50 foot lot. The frontage<br />

will be 75 feet with a property status equal to 1. The other 50 foot lot owner<br />

has an empty building lot. We combine the non-buildable 25 foot lot with the<br />

50 foot lot. The resulting frontage shall be 75 feet with a property status<br />

equal to 2.<br />

b. Case - A particular subdivision has a typical lot width of 60 feet. However.<br />

due to a property split or other cause, an individual parcel having a lot<br />

width less than 60 feet exists which, due to subdivision or Department of<br />

Health <strong>regulations</strong>, cannot be built upon. Further, the lots on either side<br />

of the individual parcel are owned by separate owners.<br />

ASSESSMENT METHOD: If the property can be developed once a public <strong>sewer</strong><br />

is available, the parcel shall be assigned a property status equal to 2 <strong>and</strong><br />

assessed. If the property still cannot be developed even though a public -<br />

<strong>sewer</strong> is available due to subdivision restrictions, the parcel shall be<br />

assigned a property status equal to 4 <strong>and</strong> not be assessed.