30.01.2015 Views

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

ottawa county sewer district wastewater rules and regulations for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SANITARY SEWER MATERIAL REPLACEMENT AGREEMENT<br />

THIS AGREEMENT made <strong>and</strong> entered into as of this _____ day of ___________________, 201___,<br />

by <strong>and</strong> between the Board of County Commissioners of Ottawa County, Ohio (hereinafter referred to as<br />

the “County”) <strong>and</strong> _______________________________ (hereinafter referred to as the “Property<br />

Owner”)<br />

WITNESSETH THAT:<br />

WHEREAS, the County has established <strong>rules</strong> <strong>and</strong> <strong>regulations</strong> <strong>for</strong> en<strong>for</strong>cement of remediating excessive<br />

infiltration <strong>and</strong> inflow; <strong>and</strong><br />

WHEREAS, the County wishes to assist property owners with eliminating excessive Infiltration/Inflow by<br />

initiating a Material Replacement Program of sanitary <strong>sewer</strong> construction materials; <strong>and</strong><br />

WHEREAS, the Property Owner has submitted a Sewer System Evaluation Study <strong>and</strong><br />

Infiltration/Inflow Remediation Plan which has been approved by the County Sanitary Engineer; <strong>and</strong><br />

WHEREAS, the Infiltration/Inflow Remediation Plan calls <strong>for</strong> certain materials to be used by the<br />

property owner to replace failed infrastructure causing excessive Infiltration/Inflow; <strong>and</strong><br />

WHEREAS, the County wishes to provide at no cost to the Property Owner certain materials to be<br />

installed by the Property Owner to correct the excessive Infiltration/Inflow identified in the Sewer<br />

System Evaluation Study <strong>and</strong> I/I Remediation Plan; <strong>and</strong><br />

WHEREAS, detailed sanitary <strong>sewer</strong> replacement plans have been prepared by a professional engineer<br />

<strong>and</strong> approved by the Sanitary Engineer <strong>and</strong> Ohio EPA identifying the materials <strong>and</strong> costs to implement<br />

the Remediation Plan;<br />

NOW, THEREFORE, it is agreed by <strong>and</strong> between the parties hereto as follows:<br />

1. Property Owner, whose real property is located at ________________________<br />

________________________________________________________________<br />

desires to seek construction materials to do the following work:<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

________________________________________________________________<br />

2. Material to be provided by the County at no cost to the Property Owner.<br />

Item<br />

6" Sanitary Sewer Main<br />

8" Sanitary Sewer Main<br />

10"Sanitary Sewer Main<br />

12" Sanitary Sewer Main<br />

4" Sanitary Sewer Lateral<br />

6" Sanitary Sewer Lateral<br />

PVC Fittings<br />

Manhole (complete)<br />

Flush-outs (complete)<br />

Granular bedding (57's)<br />

Quantity<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!