6.3 Cost Advice Summary<br />

The cost advice <strong>for</strong> each treatment has been summarised and with an expect cost <strong>of</strong> between $240,700<br />

– 305,900 <strong>for</strong> the implementation <strong>of</strong> the recommendations provided. A further cost breakdown is<br />

provided detailing the two priorities immediate / short term and medium / long term. The estimated cost<br />

<strong>for</strong> each <strong>of</strong> the priority is listed below:<br />

immediate / short term - $110,700 - $135,900<br />

medium / long term - $130,000 - $170,000<br />

The tables below detail a cost breakdown <strong>for</strong> each <strong>of</strong> the treatments under their respective priority.<br />

Table 7<br />

Immediate / Short Term<br />

Proposed Treatment<br />

No.<br />

Sites<br />

No.<br />

Treatments<br />

per site<br />

Individual<br />

Treatment Cost<br />

Total<br />

Treatment<br />

Cost<br />

The installation <strong>of</strong> ‘Remember 50 km/h’<br />

advisory speed signs<br />

Pavement marking (new lane centre line<br />

and <strong>for</strong>malise on-street parking)<br />

Upgrade <strong>of</strong> existing pavement bar<br />

treatment (replacement <strong>of</strong> lost pavement<br />

bars and implementation <strong>of</strong> ‘No Stopping’<br />

linemarking)<br />

Installation <strong>of</strong> new pavement bar<br />

treatment<br />

Installation <strong>of</strong> raised median and kerb<br />

relocation<br />

4 1 $500-800 $2000 - 2400<br />

3 1 $2,000-3,000 $6,000 - 9,000<br />

4 1 $800-1,000 $3,200 - 4,000<br />

1 1 $2,000-3,000 $2,000 - 3,000<br />

1 1 $6,000-8,000 $6,000 - 8,000<br />

Installation <strong>of</strong> road cushions<br />

2<br />

5 and 6<br />

(Total <strong>of</strong> 11)<br />

$3,500 $38,500<br />

Installation <strong>of</strong> raised kerb median and<br />

pavement marking (<strong>for</strong>malise on-street<br />

parking)<br />

1 8 $6,000-8,000<br />

$48,000 -<br />

$64000<br />

Installation pedestrian refuge 1 1 $5,000-7,000 $5,000 - 7,000<br />

Immediate / Short Term Cost Advice<br />

$110,700 –<br />

135,900<br />

* This document is in a draft and not a final issued <strong>for</strong>m. The contents <strong>of</strong> this draft document including any opinions, conclusions or recommendations<br />

contained in or which may be implied from this draft document must not in any way whatsoever be relied upon. GHD reserves the right, at any time<br />

with or without notice, to amend, modify or retract any part or all <strong>of</strong> the draft document including any opinions, conclusions, or recommendations<br />

contained therein. Unauthorised use <strong>of</strong> this draft document in any <strong>for</strong>m whatsoever is strictly prohibited. To the maximum extent permitted by law,<br />

GHD disclaims any responsibility <strong>for</strong> liability howsoever arising from or in connection with this draft document.<br />

33/15485/45000 <strong>Munno</strong> <strong>Para</strong><br />

LATM Plan<br />

42