F. INSPECTION RESULTS AND DOCUMENTATION<br />

1 . Requirements<br />

a. The data interpreter shall be certified to Level IIA or IIIA as per Procedure QA 101.<br />

b. Data shall be collected with an eddy current test system with a current certification<br />

of calibration as per CSP procedure.<br />

c. The data collection system shall be calibrated with an approved reference<br />

standard that is serialized and traceable to a master reference standard.<br />

d. The identify of the plant site, the steam generator, the operators name and<br />

certification, the date, the test frequencies, the reference standard serial numbers,<br />

equipment serial numbers and certification dates, software revisions and probes<br />

design and serial number shall be recorded at the start of each calibration cycle.<br />

e. data collection station shall be set up and calibrated as per Procedure OA 3.<br />

Charlie Chong/ Fion Zhang