04.05.2015 Views

Experiment Proposal - opera - Infn

Experiment Proposal - opera - Infn

Experiment Proposal - opera - Infn

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Special attention has to be paid to the temperature control and to the electric power, since each<br />

S-UTS requires about 3 kW . In addition, a computer network infrastructure is required. The scanning<br />

rooms where the Track Selectors <strong>opera</strong>te have to be clean and have controlled temperature and humidity.<br />

The floor has to be rigid to avoid vibrations while moving the microscope stages and the objective lenses.<br />

The number of the required S-UTS systems is given inSection6. Asmallcomputer room is also needed<br />

for monitoring and controlling the station <strong>opera</strong>tion as well as for the online data storage.<br />

The Emulsion Readout Facility<br />

for Vertex Location<br />

planned at Nagoya University<br />

S-UTS and UTS<br />

for Scan Back in a brick<br />

and Vertex Confirmation<br />

Stock Room for Emulsion Films<br />

Computer Room for Online Monitoring<br />

S-UTS<br />

for General Scan<br />

on SS and VETO films<br />

S-UTS and UTS systems are in a Clean Room<br />

Figure 180: Illustration of a station for vertex location planned at Nagoya University. 10 S-UTS are<br />

assigned for general scan for SS and VETO films. 3 UTS are for scan back and 3 S-UTS for vertex<br />

confirmation. The S-UTS systems for vertex confirmation are used for full data taking over night.<br />

In order to <strong>opera</strong>te such a station, two 8-hours shift per day are needed each with two <strong>opera</strong>tors. The<br />

S-UTS systems can perform unattended scanning of VETO and SS over night (the remaining 8 hours).<br />

One physicist on shift is needed to monitor the station performance. A specific effort of coordination of<br />

the shift acitivities is therefore required and has to be supported by the Collaboration.<br />

Stations for other purposes do not require such a large capability as for the vertex location. Stations<br />

for full data taking require a relatively large infrastructure, while stations for high accuracy measurements<br />

(for special events) and for cross-check analysis of candidates could be well located in several small<br />

laboratories, since they only process a small fraction of events. The required manpower obviously depends<br />

254

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!