10.07.2015 Views

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

As soon as the technical AS2 connection has been set up test messages will be exchanged between<strong>SupplyOn</strong> <strong>and</strong> the supplier. Please note that the test messages have to correspond to the <strong>SupplyOn</strong>message format guidelines.8.1 Organization, milestones <strong>and</strong> acceptance criteria for the integration project- The supplier has to prepare his system for sending <strong>and</strong> receiving messages via AS2 <strong>and</strong> toprocess AirSupply files before the project starts.- The <strong>SupplyOn</strong> contractual partner is responsible for receiving <strong>and</strong> sending messages, EDImapping, syntax validation <strong>and</strong> content accuracy of sent messages from <strong>SupplyOn</strong>.- The <strong>SupplyOn</strong> contractual partner has to configure the message scheduler. It contains allconfiguration options for creating a schedule which determines:• When a message will be sent to an EDI supplier (frequency)• Which content a message contains (filtering options)- The <strong>SupplyOn</strong> contractual partner has to use the message monitor. It shows a report over allmessages (inbound <strong>and</strong> outbound) for one supplier within the last 45 days.- Routing <strong>and</strong> syntax errors will be transmitted in the SO-Status Notification via AS2 connectionfrom <strong>SupplyOn</strong>.The integration phase starts with agreed project start date from the Deviating Price Agreement M2M.The project is scheduled for a period of maximum 10 weeks plus 2 weeks for migration preparation.PW (project week) 1 2 3 4 5 6 7 8 9 10 11 12Setup technical connectionPREPRD L<strong>and</strong>scapex x xProcess outbound messages x xProcess inbound messages Order Confirmationx Forecast Confirmationx VMI Planned Receiptsx8.2 Phases <strong>and</strong> acceptance8.2.1 Phases Despatch Advice x xAcceptance Test <strong>SupplyOn</strong>Setup technical connectionPRD L<strong>and</strong>scapeFollowing phases will be part of the project: Phase 1: Setup AS2 technical connection <strong>and</strong> testing on Integration L<strong>and</strong>scape Phase 2: Outbound message test Phase 3: Inbound message test Phase 4: Solution verification test Phase 5: Setup AS2 technical connection <strong>and</strong> testing on Productive L<strong>and</strong>scape Phase 6: Airbus migration - in responsibility of Airbus Phase 7: Post Go-Live supportxx x xProcess Post Golive Support x xPublic 32/59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!