10.07.2015 Views

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Acceptance criteria- The supplier has ensured that the qualified EDI contact person has understood the M2M<strong>Guideline</strong>s <strong>and</strong> format specifications- The processing of all test cases with• m<strong>and</strong>atory <strong>and</strong> optional fields• <strong>and</strong> processing to the backend integration occurs without errors.- All relevant test case messages have been shown to <strong>SupplyOn</strong> as successfully processed(Screenshots of processed message in the ERP or log file)- The project phase has been finished in time8.2.1.3 Phase 3Inbound message testedTarget: Inbound messages must pass <strong>SupplyOn</strong> routing <strong>and</strong> syntax validation testing without errorWork packages: Duration 10 days<strong>SupplyOn</strong> will provide the supplier sample test messages <strong>and</strong> instruction how to develop inboundmessage similar to the <strong>SupplyOn</strong> sample messages.Phase 2 (Outbound messages) <strong>and</strong> Phase 3 (Inbound messages) can be worked in parallelTest procedure- The supplier creates inbound response messages based on the <strong>SupplyOn</strong> Mapping Instructions- <strong>SupplyOn</strong> informs the supplier if the inbound message has syntax or routing errors- Additionally the routing <strong>and</strong> syntax error will be transmitted in a status notification via AS2connection to the supplier- The supplier has to correct the routing or the syntax error in the test messages- The adjustment has to correct within the agreed project time, <strong>and</strong> the supplier has to inform<strong>SupplyOn</strong> about the solution date.Acceptance criteria- The supplier has ensured that the technical EDI contact person has understood the AirSupplyM2M <strong>Guideline</strong>s <strong>and</strong> format specifications.- The processing of the test cases with m<strong>and</strong>atory <strong>and</strong> optional fields have been processed withouterrors.8.2.1.4 Phase 4Solution verification testWork packages: Duration 5 DaysThe acceptance test is used to complete the message flow without any routing <strong>and</strong> syntax errors in themessages between <strong>SupplyOn</strong> <strong>and</strong> the supplier.Test procedure:Outbound messagesAfter receiving the test outbound messages the supplier has to inform <strong>SupplyOn</strong> Integration Contact- they have received the messages- the message can be mapped <strong>and</strong> processed- if mapping adjustments are necessaryThe supplier must communicate to <strong>SupplyOn</strong> if mapping adjustments are required <strong>and</strong> the solution dateInbound messages- The supplier creates inbound response messages based on the <strong>SupplyOn</strong> Mapping InstructionsPublic 34/59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!