10.07.2015 Views

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

BoostAero XML and CSV Implementation Guideline ... - SupplyOn

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- <strong>SupplyOn</strong> informs the supplier if the inbound message has syntax or routing errors- Additionally the routing <strong>and</strong> syntax error will be transmitted in a status notification via AS2connection to the supplierAcceptance criteriaThe supplier has ensured that the mapping process for the outbound <strong>and</strong> inbound messages works for alltest cases without error.8.2.1.5 Phase 5Setup AS2 technical connection <strong>and</strong> testing on Productive L<strong>and</strong>scapeWork packages: 15 daysAS2 connection will be set up on the production l<strong>and</strong>scape. Transport all settings from test system toproductive system <strong>and</strong> setup message scheduler for productive system.Verify <strong>and</strong> exchange connectivity data for productive l<strong>and</strong>scape.The procedure is similar to the Integration L<strong>and</strong>scape, but the AS2 technical setup specifications aredifferent. (See <strong>SupplyOn</strong> AirSupply AS2 data parameter sheet)Step 1 - The Supplier <strong>and</strong> <strong>SupplyOn</strong> will be exchange the connectivity data for an AS2 connection. Bothparties have to setup the technical AS2 partner, firewall settings <strong>and</strong> certificates. After the technical setupthe connection test can start.Step 2 - The supplier has to provide a screenshot or a logfile to <strong>SupplyOn</strong> after a successful AS2connection.Test procedure- <strong>SupplyOn</strong> sends to the supplier a couple of test connectivity messages to verify the technical AS2connection functions.- The supplier sends to <strong>SupplyOn</strong> a couple of test messages to verify the technical AS2 connectionto <strong>SupplyOn</strong>- The supplier verifies the AS2 Connection to/from <strong>SupplyOn</strong> is working.Acceptance criteriaThe validation is as follows- Two messages will be exchanged without errors from <strong>SupplyOn</strong> to the supplier- Two messages will be exchanged without errors from supplier to <strong>SupplyOn</strong>- The AS2 connection shows an SSL encryption- No firewall issues on message exchange- The certificate is from a approved institution8.2.1.6 Phase 6Migration will be organized <strong>and</strong> coordinated by Airbus.8.2.1.7 Phase 7Post Go-Live support- Check of message transfer- H<strong>and</strong>over to <strong>SupplyOn</strong> Operation TeamPublic 35/59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!