11.07.2015 Views

RETAIL TENANT DESIGN CRITERIA MANUAL - Brookfield Properties

RETAIL TENANT DESIGN CRITERIA MANUAL - Brookfield Properties

RETAIL TENANT DESIGN CRITERIA MANUAL - Brookfield Properties

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Supply of standard distribution boardwithin tenancyInstallation of electrical meterModification or upgrade of powersupply to distribution boardTenancy lighting and GPO installationand connectionEmergency and Exit lighting withintenancy to suit codes and regulationsElectrical Authority’s inspection andconnectionSupply of 40amp single phasecontactor connected to BuildingManagement BMS for shopfrontlighting connectionBuildingManagementBuildingManagementBuildingManagementBuilding ManagementBuilding ManagementBuilding ManagementBuildingManagementTenantTenantBuildingManagementBuildingManagementBuildingManagementBuildingManagementBuildingManagementBuildingManagementTenant Tenant Tenant Tenant TenantBuildingManagementBuildingManagementBuilding ManagementBuilding ManagementTenantTenantBuildingManagementBuildingManagementBuildingManagementBuildingManagementBuildingManagementHydraulics/plumbingDescription Who Designs Who Constructs Who Pays Who Owns Who MaintainsWater supply to tenancy (including isolation valve)BuildingBuildingBuildingBuildingBuildingManagement Management Management Management ManagementReticulation pipe work within tenancy from isolationvalve, to suit Tenant’s tenancy designTenant Tenant Tenant Tenant TenantHot water unit Tenant Tenant Tenant Tenant TenantSink (incl. tap hardware, etc) Tenant Tenant Tenant Tenant TenantWaste point (1 outlet)BuildingBuildingBuildingBuildingBuildingManagement Management Management Management ManagementTundish (where applicable)BuildingBuildingBuildingBuildingBuildingManagement Management Management Management ManagementModification or additional connections to waste orBuildingBuildingBuildingBuildingTenanttundish points requiredManagement ManagementManagement ManagementStandard Trade waste outlet (1 x outlet to identifiedtenancies)BuildingManagementBuildingManagementBuildingManagementBuildingManagementBuildingManagementNew connection to standard waste, trade waste orBuildingBuildingBuildingBuildingTenantmodificationManagement ManagementManagement ManagementWater Sub MeterBuildingBuildingBuildingBuildingTenantManagement ManagementManagement ManagementInternal tenancy reticulation of water, sewer and waste Tenant Tenant Tenant Tenant Tenant31 <strong>Brookfield</strong> Commercial Operations Retail Tenant Design Criteria Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!