11.07.2015 Views

RETAIL TENANT DESIGN CRITERIA MANUAL - Brookfield Properties

RETAIL TENANT DESIGN CRITERIA MANUAL - Brookfield Properties

RETAIL TENANT DESIGN CRITERIA MANUAL - Brookfield Properties

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

they wish to secure and the locks must be compatible with thebase building master key system at all times.3. No smoking is permitted in the buildings. All contractors are tobe attired properly with all personal protective equipmentrequired for the work they are undertaking. The use of illegalsubstances, consumption of alcoholic beverages and the use ofprofane language on the work site are strictly prohibited.Moreover, the contractor must ensure that workers are notunder the influence of drugs or alcohol at any time whileworking. Violation will result in all work being stopped.4. Any delivery or collection through the loading dock must becoordinated with Building Management and will only take placein the bay or bays and at the times agreed to prior to thedelivery or collection taking place. Deliveries will not be allowedduring peak times. The Tenant will be responsible for any trafficmanagement costs that may be required as a result of theirmovements. The Tenant will also be responsible for obtainingany and all approvals from the council where loading orunloading is required from the street.5. The contractor is responsible for locating adequate parking.Under no circumstances are vehicles to congest courier parkingor block access to the site’s loading dock facilities. Parking onsiteis not available. The loading dock is for loading/unloading ofmaterials only; parking in the loading dock is strictly prohibitedat all times.6. Use of building facilities other than those designated by BuildingManagement is not permitted. Under no circumstances aretools, brushes, etc to be cleaned in basins located in toilet ortearoom areas.7. All finishes, fixtures and fittings shall be adequately protectedagainst damage to the satisfaction of Building Management.Any such damage is to be made good immediately, at the costof the Tenant. Carpet in all working areas must be properlycovered with an acceptable protective material to the approvalof Building Management, including lobbies and corridors. TheBuilding Management will take no responsibility for damagedcarpet and will request that the Tenant undertake rectificationworks if required.8. Goods Lift - Goods lift use is available in some areas, pleaseconfirm with Building Management as to access requirements.9. Normal operating hours for the Portside Wharf precinct isbetween 7.00 am to 5.00pm Monday to Friday however due tothe nature of this mixed use precinct, consideration shall begiven to tenants, residents and the public when required. TheBuilding Management shall be advised of any noisy worksproposed so that the work can be coordinated so as not todisturb or disrupt any other planned and authorised activities orthe quiet enjoyment of other occupants on the same or adjacentfloors. If Building Management determines any constructionrelated noise is too loud or disruptive during regular workinghours the contractor will be instructed to cease the activitiesimmediately. The contractor shall perform all noisy, dusty andodorous work before 7:00am or after 12:00 Midnight and onlyafter receipt of written authorisation from Building Management.5.2.E Hoarding1. Building Management may deem it necessary for the Tenant tohoard off portions of their work. The hoarding is to be of aquality, material and construction that presents in anaesthetically pleasing manner. Please consult with BuildingManagement for clarification. Hoarding will be installed at theTenant’s expense.2. The hoarding will be positioned maximum 80mm beyond thelease line, dust proof, neat, built of gypsum, full height, taped,sanded and painted in a neutral colour.42 <strong>Brookfield</strong> Commercial Operations Retail Tenant Design Criteria Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!