11.07.2015 Views

tender document for supply, installation, testing and commissioning ...

tender document for supply, installation, testing and commissioning ...

tender document for supply, installation, testing and commissioning ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-11-19.2 The bidder’s modification or withdrawal notice shall be prepared, sealedmarked <strong>and</strong> submitted in accordance with the provisions of Para 16. Awithdrawal notice may also be sent by FAX but followed by a signedconfirmation copy, post marked not later than the deadline <strong>for</strong>submission of bids.19.3 No bid may be withdrawn in the interval between the deadline <strong>for</strong>submission of bids <strong>and</strong> the expiration of the period of bid validity.Withdrawal of a bid during this interval shall result in the bidder’s<strong>for</strong>feiture of its bid security.E. BID OPENING AND EVALUATION20.0 Opening of Bids by IKIWL.20.1 The IKIWL will open bids, in the presence of bidders’ representatives whochoose to attend, at the time <strong>and</strong> date specified in the <strong>tender</strong> notice, at the officeof the DIREDTOR(WORKS), IDCOL Kalinga Iron Works Ltd. Matkambeda-758036. The Bidders representatives who are present shall sign attendance sheetevidencing their presence during the bid opening.20.2 The Bidders’ name, bid prices, modifications, bid withdrawals <strong>and</strong> the presenceor absence of the requisite bid security <strong>and</strong> such other details as the IKIWL atits direction, may consider appropriate will be announced at the opening.21.0 Clarification of bids21.1 To assist in the examination, evaluation <strong>and</strong> comparison of bids the IKIWLmay, at its discretion ask the Bidders <strong>for</strong> a clarification of its bid. The request<strong>for</strong> clarification <strong>and</strong> response shall be in writing.22.0 Preliminary Examination22.1 The IKIWL will examine the bids to determine whether they are complete,whether any computational errors have been made, whether required sureties havebeen furnished, whether the <strong>document</strong>s have been properly signed, <strong>and</strong> whetherthe bids are generally in order.22.2 Arithmetical errors will be rectified on the following basis. If there is adiscrepancy between the unit price <strong>and</strong> total price that is obtained by multiplyingthe unit price <strong>and</strong> quantity, the unit price shall prevail. If there is discrepancybetween words <strong>and</strong> figures the amount in word will prevail. The total price shallbe corrected accordingly. If the bidder does not accept the correction of the errorsits bid will be rejected.22.3 Prior to the detailed evaluation, pursuant to Para 23, the IKIWL will determinethe substantial responsive of the bid to the bidding <strong>document</strong>s. For purpose ofthese clauses, a substantially responsive bid is one, which con<strong>for</strong>ms to all theterms <strong>and</strong> conditions of the bidding <strong>document</strong>s without material deviations. TheIKIWL determination of a bid’s responsiveness is to be based on the contents ofthe bid itself.IKIWLSignature of Bidder

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!