-27-SECTION-IVSPECIAL CONDITIONS OF CONTRACTERECTION AND COMMISSIONING1.0 Sufficiency of TenderThe contractor by bidding shall be deemed to have satisfied himself as to all theconditions <strong>and</strong> circumstances effecting the contract price, as to the possibility ofexecuting the work as shown as prescribed in the contract, as to the generalcircumstances at the site of the works, as to the general labour position at site,<strong>and</strong> to have determined the price accordingly.2.0 Programme of <strong>installation</strong> <strong>and</strong> <strong>commissioning</strong>Within 30 days of receipt of letter of acceptance of the bid, the contractor shallsubmit to the IKIWL <strong>for</strong> approval of comprehensive programme in the <strong>for</strong>m ofPERT Network/bar chart <strong>and</strong> any other <strong>for</strong>m as may be required by the IKIWLshowing the sequence of order in which the contractor proposes to carry out theworks including the design, manufacture, delivery to site, erection, hooking-up,<strong>commissioning</strong>, trial run & h<strong>and</strong>-over, thereof. After submission to <strong>and</strong>approval by the IKIWL of such programme, the contractor shall adhere to thesequence of order <strong>and</strong> method stated therein. The submission to <strong>and</strong> approval bythe IKIWL of such programme shall not relieve the contractor of any of hisduties or responsibilities under the contract. The programme approved by theIKIWL shall <strong>for</strong>m the basis of evaluating the pace of all works to be per<strong>for</strong>medby the contractor. The contractor shall update the PERT network every month,submit it to the IKIWL <strong>and</strong> shall in<strong>for</strong>m the IKIWL the progress on all theactivities failing on schedule <strong>for</strong> the next reporting date.3.0 Preparations of drawings <strong>for</strong> approvalThe contractor should visit the site to acquaint himself in respect of existing siteconditions <strong>and</strong> to know the details/in<strong>for</strong>mation required <strong>for</strong> underst<strong>and</strong>ing thenature <strong>and</strong> type of civil construction works involved in the project.The contractor shall submit to the IKIWL approval:a) Within the time given in the specification or in the programme, such drawing,samples, patterns, <strong>and</strong> models as may be called <strong>for</strong> therein, <strong>and</strong> in numberstherein required.b) During the progress of works <strong>and</strong> within such reasonable times as the IKIWLmay required such drawings of the general arrangement <strong>and</strong> detailed of theworks as the IKIWL may require.IKIWLSignature of Bidder

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!