11.07.2015 Views

tender document for supply, installation, testing and commissioning ...

tender document for supply, installation, testing and commissioning ...

tender document for supply, installation, testing and commissioning ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-19-shall have to make good the losses/damages occurred in transit by makingreplacement/payment to us in the instance <strong>and</strong> if the claims are settled by theunderwriters <strong>and</strong> any amounts are realized by us, the amounts thus realized insettlement of claims shall be reimbursed to you. In other words, the prima facieresponsibility rests on you <strong>for</strong> getting compensation of the damage/lossesincurred if any, due to all transit hazards.10.2 During shortage at site:The contractor shall arrange <strong>for</strong> insurance of all items stored/received at the siteincluding the items of <strong>supply</strong> covered under this contract & the contractor shallfurnish necessary details of such insurance to the IKIWL, on dem<strong>and</strong>. Anydefault on the part of the contractor due to which any item does not get coveredunder insurance; the consequential losses shall be arranged to the contractor.The contractor shall arrange <strong>for</strong> insurance of all the itemsbrought by him to site <strong>for</strong> use during the execution of the contract, till h<strong>and</strong>ingover of the complete job.11. TransportationThe contractor is required to deliver the goods FOR Destination, by road.Transport of the goods to the destination shall be arranged through a reputed<strong>and</strong> Bank approved transporter having local offices at destination <strong>and</strong> Barbil,<strong>and</strong> shall be paid <strong>for</strong> by the contractor.12. Incidental service12.1 The contractor is required to provide the following services:a) Per<strong>for</strong>mance of on-site assembly, <strong>installation</strong>, hooking-up to existing system,start-up, <strong>testing</strong>, <strong>commissioning</strong>, per<strong>for</strong>mance trial run <strong>for</strong> a period of 30days <strong>and</strong> h<strong>and</strong>ing over of the supplied goods;b) Furnishing of tools & tackles required <strong>for</strong> assembly <strong>and</strong> maintenance of thesupplied goods;c) Furnishing of a detailed operations <strong>and</strong> maintenance manual <strong>for</strong> eachappropriate unit of supplied goods;d) Operation, maintenance <strong>and</strong> repair of the supplied goods <strong>for</strong> period of 30days, provided that this service shall not relieve the contractor of anyWarranty obligations under this contract; <strong>and</strong>e) Conduct of training of the IKIWL personnel, on-site, in assembly, start-upoperation, maintenance <strong>and</strong> repair of the supplied goods, if required.IKIWLSignature of Bidder

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!