11.07.2015 Views

tender document for supply, installation, testing and commissioning ...

tender document for supply, installation, testing and commissioning ...

tender document for supply, installation, testing and commissioning ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-37-All other works completed or in progress as well as machinery <strong>and</strong> equipmentthat are liable to be damaged by the Contractor’s work shall be protected by theContractor <strong>and</strong> protection shall remain <strong>and</strong> be maintained until its removal isdirected by the IKIWL.The Contractor shall effectively protect from the effects of weather <strong>and</strong> fromdamages or defacement <strong>and</strong> shall cover appropriately, wherever required, all theworks <strong>for</strong> their complete protection.The contractor shall carry out the work without damage to any work <strong>and</strong>property adjacent to the area of Contractor’s work to whomsoever it may belong<strong>and</strong> without interference with the operation of existing machines or equipment.Adequate lighting, guarding <strong>and</strong> watching at end near all the storage,h<strong>and</strong>ling, fabrication, reassembly <strong>and</strong> erection sites <strong>for</strong> properly carrying out thework <strong>and</strong> <strong>for</strong> safety <strong>and</strong> security shall be provided by the Contractor at his cost.The Contractor should adequately light the work area during night time also.The Contractor should also engaged adequate electricians/wiremen, helper etc.to carry out <strong>and</strong> maintain these lighting facilities. If the Contractor fails in thisregard, the IKIWL may provide lighting facilities as he may deem necessary<strong>and</strong> charge the const thereof to the Contractor.The Contractor shall take full responsibility <strong>for</strong> the care of the works or anysection or portions thereof until the date stated in the taking over certificateissued in respect thereof <strong>and</strong> in case any damage or loss shall happen to anyportion of the works not taken over as a<strong>for</strong>esaid, from any cause whatsoever,the same shall be made good by <strong>and</strong> at the sole cost of the Contractor <strong>and</strong> to thesatisfaction of the IKIWL. The Contractor shall also be liable <strong>for</strong> any loss of ordamage to the works occasioned by the Contractor or his sub-contractor in thecourse of any operations carried out by the Contractor or his sub-contractors <strong>for</strong>the purpose of completing any outst<strong>and</strong>ing work or complying with theContractor’s obligations.11. Unloading, transportation <strong>and</strong> inspectionThe Contractor shall be required to unload all the materials/equipment from thecarriers. The Contractor shall plan in advance, based on the in<strong>for</strong>mationreceived from the IKIWL, Contractor’s requirement of various tools, tackles,jacks, cranes, sleepers etc. required to unload the material/equipment promptly<strong>and</strong> efficiently. The Contractor shall ensure that adequate <strong>and</strong> all measurednecessary to avoid any damage whatsoever to the equipment at the time ofunloading are taken.Any demurrage/detention charges incurred due to the delay in unloading thematerial/equipment <strong>and</strong> releasing the carriers shall be charged to theContractor’s account.IKIWLSignature of Bidder.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!