11.07.2015 Views

131 LA UR 03 5862 - National Nuclear Security Administration ...

131 LA UR 03 5862 - National Nuclear Security Administration ...

131 LA UR 03 5862 - National Nuclear Security Administration ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2-104SWEIS Yearbook—2002Table 2.10.1-1. High Explosive Testing Construction and ModificationsSWEIS RODACTUAL CONSTRUCTION AND MODIFICATIONPROJECTION 1998 YEARBOOK 1999 YEARBOOK 2000 YEARBOOK a 2001 YEARBOOK 2002 YEARBOOKDARHT facilityconstruction andmodificationConstruction of theDARHT building(TA-15-312) continued.DARHT cooling towerbecame operational in1998.Hydrodynamic TestOperations Controlbuilding (TA-15-484)constructed and becameoperational in spring1999 (<strong>LA</strong>NL 1996c).Access Control Building(TA-15-446) becameoperational in 1998 (DOE1993b).Ector Multi-diagnosticHydrotest acceleratortaken out of service.(Firing site remainsactive).Construction of theDARHT building(TA-15-312) continued(DOE 1995b).DARHT Axis I operational.Installation andcomponent testing of theaccelerator and itsassociated control anddiagnostics systems beganin 1999.Construction of the DARHTbuilding (TA-15-312)completed in 1999 (DOE1995b).Installation and componenttesting of the acceleratorand its associated controland diagnostics systemsbegan in 1999 andcontinued in 2000.Construction of theDARHT building(TA-15-312) completed in1999 (DOE 1995b).Installation andcomponent testing of theaccelerator and itsassociated control anddiagnostics systems beganin late 1999 and continuedin 2001.Vessel PreparationFacility constructed atTA-15 (DOE 1995b).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!