11.07.2015 Views

131 LA UR 03 5862 - National Nuclear Security Administration ...

131 LA UR 03 5862 - National Nuclear Security Administration ...

131 LA UR 03 5862 - National Nuclear Security Administration ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.4.1 Construction and Modifications at the Pajarito SiteProjected: The SWEIS ROD projected replacement of the portable linac machine.Actual: The portable linac has not been replaced. Construction projects for 2001 consist of the installationof two office trailers (Buildings 300 and 301) and security enhancements. In 2002, a cable tray relocationoccurred (DOE 2001a).Proposed: The environmental impact statement ROD for TA-18 relocation was issued for public commenton August 30, 2002, listing the Device Assembly Facility at the Nevada Test Site as the preferred alternative.The ROD was approved on December 5, 2002 (DOE 2002b).Table 2.4.1-1 indicates the construction and modifications that have occurred at TA-18.Table 2.4.1-1. Pajarito Site Construction and ModificationsACTUAL CONSTRUCTION AND MODIFICATIONSWEIS RODPROJECTIONReplacement ofthe portable linac1998YEARBOOK1999YEARBOOK2000YEARBOOK2001YEARBOOK2002YEARBOOKNot done. Not done. Not done. Not done. Not done.Installation of twooffice trailers(Buildings 300 and301)<strong>Security</strong>enhancementsCable trayrelocation (DOE2001a).An accelerator2-66SWEIS Yearbook—2002

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!