2-56Table 2.3.1-1. CMR Building Construction and Modifications (continued)SWEIS RODPROJECTIONPhase II Upgrades(except seismic) toenable operationsfor an additional20 to 30 yearsDESCRIPTION OFUPGRADES/MODIFICATIONSSanitary SewerFire Protection (Title 1/FireHazard Analysis, remainingscope moved to Phase 2)Engineering Assessment/CDR& EASafety Analysis ReportPhase II Upgrades:Seismic/Tertiary Confinement1998 YEARBOOK100% complete9. Modify thesanitary sewersystem.100% complete10. Fire hazardanalysis.100% complete.11. Engineeringassessment andconceptual design.Basis for InterimOperation completedAugust 1998.ACTUAL CONSTRUCTION AND MODIFICATION199920002001YEARBOOK a YEARBOOK b YEARBOOKProgress wasmade on 3 of theoriginal 13 PhaseII Upgradesduring 1999.<strong>Security</strong> Related to TertiaryConfinementVentilation/Confinement ZoneSeparationOperation Center 25% complete. 0% complete, indesign.80% complete,construction.2002YEARBOOK100%completed.2002 COMPLETIONSTATUS OFUPGRADESCompleted–pluggeddrains.Fire Hazard Analysiscompleted.Completed.Basis for InterimOperation completedAugust 1998.Out of scopewith re-baselining.Out of scopewith re-baselining.Out of scopewith re-baselining.Modified; completed.SWEIS Yearbook—2002StandbyPower/CommunicationsWing 1 HVAC Upgrades(includes Decontamination)Wing 2 and 4 Safe StandbyModified; completed.Out of scopewith re-baselining.Out of scopewith re-baselining.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!