11.07.2015 Views

131 LA UR 03 5862 - National Nuclear Security Administration ...

131 LA UR 03 5862 - National Nuclear Security Administration ...

131 LA UR 03 5862 - National Nuclear Security Administration ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This chapter also discusses Non-Key Facilities, which include all buildings and structures not part of a KeyFacility, or the balance of <strong>LA</strong>NL. Although operations at Non-Key Facilities do not contribute significantlyto radiation doses or generation of radioactive wastes, the Non-Key Facilities represent a significant fractionof <strong>LA</strong>NL. The Non-Key Facilities comprise all or the majority of 30 of <strong>LA</strong>NL’s 49 technical areas, andapproximately 14,224 of <strong>LA</strong>NL’s estimated 26,480 acres. The Non-Key Facilities also employ about half the<strong>LA</strong>NL workforce. The Non-Key Facilities include such important buildings and operations as the CentralComputing Facility, the TA-46 sewage treatment facility, and the Main <strong>Administration</strong> Building. Table 2.0-17identifies and compares the acreage of the 15 Key Facilities and the Non-Key Facilities. Figure 2-1 shows thelocation of <strong>LA</strong>NL within northern New Mexico, while Figure 2-2 illustrates the technical areas. Figure 2-3shows the locations of the Key Facilities.With the issuance of <strong>Nuclear</strong> Safety Management (10 CFR 830) on January 10, 2001, on-site transportationalso needs to be addressed relative to nuclear hazard categorization (FR 2001). This is a change from theSWEIS. At the time the SWEIS was published, on-site transportation was considered part of the affectedenvironment in Section 4.10.3.1. The on-site transportation of nuclear materials greater than or equal toHazard Category 3 quantities is addressed in a DOE approved safety analysis (<strong>LA</strong>NL 2002c, DOE 2002a,Steele 2002). The implementation of the analysis and associated controls is under development.Table 2.0-17. Acreage for Key and Non-Key FacilitiesFACILITY TECHNICAL AREAS ~SIZE (ACRES)Plutonium Complex TA-55 93Tritium Facilities TA-16 & TA-21 312CMR Building TA-<strong>03</strong> 14Pajarito Site TA-18 <strong>131</strong>Sigma Complex TA-<strong>03</strong> 11MSL TA-<strong>03</strong> 2TFF TA-35 3Machine Shops TA-<strong>03</strong> 8High Explosives Processing TAs 08, 09, 11, 16, 22, 28, 37 1,115High Explosives Testing TAs 15, 36, 39, 40 8,691<strong>LA</strong>NSCE TA-53 751Bioscience Facilities (Formerly Health Research Laboratory) TA-43, <strong>03</strong>, 16, 35, 46 4Radiochemistry Facility TA-48 116RLWTF TA-50 62Solid Radioactive and Chemical Waste Facilities TA-50 & TA-54 943Subtotal, Key Facilities 12,256Non-Key Facilities 30 of 49 TAs 14,244<strong>LA</strong>NL 26,4802-30SWEIS Yearbook—2002

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!