12.07.2015 Views

MCAS Miramar Airport Land Use Compatibility Plan - San Diego ...

MCAS Miramar Airport Land Use Compatibility Plan - San Diego ...

MCAS Miramar Airport Land Use Compatibility Plan - San Diego ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MCAS</strong> MIRAMAR POLICIES AND MAPS CHAPTER 3<strong>Land</strong> <strong>Use</strong> Types / Typical <strong>Use</strong>s• Multiple land use categories and compatibility criteriamay apply to a project (see Policy 3.4.7)• See Policy 3.4.7(c) for limits on ancillary uses 1Maximum Intensity Limits (People/Acre)• Applicable to nonresidential conditional land usesCBCGroup*Railroads, Public Transit Lines —Primary Power <strong>Plan</strong>ts —Peaker Power <strong>Plan</strong>ts —Electrical Substations —Public Emergency Communications Facilities —Cell Phone Towers, Wind Turbines U-2CZSafety Zone**APZIAPZIITZ10 25 50 300Criteria for Conditional(yellow) <strong>Use</strong>s• Maximum intensity limits apply to all Conditionaluses• Abbreviations below refer to zones in whichcondition specified is applicable• Numbers in yellow cells are Floor Area Ratio(FAR) limitations (see Policy 3.4.6(c) and Endnote4)APZ I, APZ II, TZ: No new sites or land acquisition/expansionof facilities on existing sites allowedif, after consultation with airport operator,ALUC determines that facility includes petrochemicalstorage or any uses that generatesmoke, heat, or visibility hazards that could interferewith the safety of flight 3APZ I: Major power lines must beunderground 3See Policy 3.4.6(h)(3)APZ I, APZ II: No new sites or land acquisition/expansionof facilities on existing sites allowedif, after consultation with airport operator,ALUC determines that facility includes petrochemicalstorage or any uses that generatesmoke, heat, or visibility hazards that could interferewith the safety of flight 3APZ I: Major power lines must beunderground 3See Policy 3.4.6(h)(3)APZ I: No new sites or land acquisition; replacement/expansionof facilities on existing sitesallowed. Major power lines must beunderground 3APZ II: New substations must not cause electronicinterference with aircraft.See Policy 3.4.6(h)(4)APZ I, APZ II: No new sites or land acquisition;modification, replacement, expansion of facilitieson existing sites allowedSee Policy 3.4.6(h)(5)APZ I, APZ II: No use of frequencies that caninterfere with military communications or navigationfrequencies; no airspace protection surfacepenetrations 3See Policy 3.4.6(h)(6)Agricultural and Other <strong>Use</strong>sAgricultural <strong>Land</strong>s: pasture, rangelands, field crops,grain crops, dry farming, vineyardsAgricultural Buildings: barns, feed lots, stockyards,riding stables [approx. 1,000 s.f./person]Wooded Areas: forests, tree farms, orchards ——U-1 0.57CZ: Subject to DOD standards (as specified inOPNAV Instruction 11010.36b and NAVFAC P-80.3)See Policy 3.4.6(i)(1)APZ I: FAR limit as indicated; maximum intensitylimit as indicated at top of pageSee Policy 3.4.6(i)(2)Table MIR-2, continuedSafety <strong>Compatibility</strong> Criteria<strong>MCAS</strong> <strong>Miramar</strong><strong>MCAS</strong> <strong>Miramar</strong> <strong>Airport</strong> <strong>Land</strong> <strong>Use</strong> <strong>Compatibility</strong> <strong>Plan</strong> (Adopted October 2008 and Amended Dec 2010 and Nov 2011) 3–25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!