12.07.2015 Views

GEA CAIRfricostar - CS Klimateknik

GEA CAIRfricostar - CS Klimateknik

GEA CAIRfricostar - CS Klimateknik

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance<strong>GEA</strong> <strong>CAIRfricostar</strong>9.1.1 Basic information regarding the cleaning of finsELECTRICAL HAZARD AND DANGER FROM ROTATING UNIT PARTS! OB-SERVE PERSONAL PROTECTION MEASURES!In this connection make sure to observe the safety information on page 50.DANGER FROM SHARP EDGES!There is a danger that the thin fins may inflict cuts during cleaning.The fin assembly must be cleaned to ensure that the heat exchanger continues tooperate at full capacity. This can be carried out using a brush (not wire brush) or anindustrial vacuum cleaner. Do not use hard or sharp cleaning tools!Copper or aluminium fins may be blown out against the direction of the airflow usingcompressed air, or sprayed with water at low pressure for cleaning.9.2 Maintenance intervals (check list)The maintenance intervals as defined in European guidelines and standards (e. g.: VDI2089) must be observed.ELECTRICAL HAZARD AND DANGER FROM ROTATING UNIT PARTS ANDSHARP EDGES! OBSERVE PERSONAL PROTECTION MEASURES!In connection with maintenance procedures described in this section make sureto observe all safety information on page 50 and page 51!The following tables contain short description of all maintenance intervals and associatedprocedures. Detailed description of maintenance steps for individual units componentsis specified starting from page 54.Additional maintenance procedures during the first three months after commissioningare apecified in „Table 9-1“ .All other maintenance procedures are specified in „Table 9-2“ .Pay attention during the first two years after commissioning to „Maintenance log bookfor your <strong>CAIRfricostar</strong> – Air handling unit for swimming pools“ on page 65 in Appendixto the current operation manual.During the first 3 months after commissioning:Unit component Interval Procedure ✓The whole unit monthly • Perform all operations as described in „Basic cleaning and maintenance tasks“on page 50.• Clean and refill existing siphons. (reduce the interval if necessary)• Test the unit’s dehumidification function.Tab. 9-152 PR-2006-0019-GB • Subject to modifications • Status 05/2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!