GEA CAIRfricostar - CS Klimateknik
GEA CAIRfricostar - CS Klimateknik
GEA CAIRfricostar - CS Klimateknik
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>GEA</strong> <strong>CAIRfricostar</strong>Maintenance•••Straight edgeFig. 9-1:Pulley alignment and V-belt tensioningShifting or removing V-belt pulleys• Slacken V-belt, see „Tensioning/renewing V-belt“ on page 56, then:• Remove V-belt.• Release and unscrew both hexagon-socket screws (2).• Screw a hexagon-socket screw into the empty threaded hole (1) and turn to loosenboth pulley and sleeve.• Pull the pulley unit off the motor shaft (fan shaft) and remove.Fig. 9-2ShaftSleeveHexagon socket screwsfor securing pulleyTo install the V-belt pulley, proceed as follows:• Position the pulley and sleeve so that they engage with oneanother. Align both holes and screw in screws withouttightening.• Slide the pulley and sleeve along the shaft until it is as closeas possible to the motor or fan (to keep leverage small) andalign. (Alignment: see „Tensioning/renewing V-belt“ onpage 56).• Tighten the hexagon-socket screws evenly.Threaded holeto press out pulleyV-belt pulleyFig. 9-3:Installing the V-belt pulley• Please observe the maximum tightening torques of the hexagon-socket screwsduring installation:Sleeve-Nr. 1008 1108 1210 1610 1615 2012 2517 3020 3030 3525 3535Max. tightening torque (Nm) 5,6 5,6 20 20 20 32 50 90 90 115 115Tab. 9-4: Maximum tightening torques• Check electric motors for dirt, damage and corrosion, also check mountings.• Check motor and fan for noise in bearings, replace bearings if necessary.PR-2006-0019-GB • Subject to modifications • Status 05/2009 57