12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power CabinetThe power cabinet will be placed in the Wollongong Communications Room. The cabinet will bepainted aluminium and be approximately 1700 millimetres high by 1000 millimetres long by 880millimetres wide. It will be placed on a steel plinth with a minimum height <strong>of</strong> 200 millimetres toallow <strong>for</strong> the management <strong>of</strong> cables entering the cabinet. The power supply will enter thecabinet via conduit located at the rear <strong>of</strong> the cabinet.The power cabinet will consist <strong>of</strong> the following:• AC and earth terminations;• transfer switch (mains and generator positions);• surge protection;• general purpose outlet;• low voltage disconnect;• rectifier modules;• controller/supervisory module;• DC distribution rack; and• batteries (with the capability <strong>of</strong> providing a minimum <strong>of</strong> four hours’ back-up).MonopoleThe antennas will be connected installed on an existing 30 metre high MetroNet pole in the railcorridor approximately 38 metres from the eastern side <strong>of</strong> the track. Two Argus antennas will bemounted 24 metres above the ground with azimuths <strong>of</strong> 10° and 195°. The antennas will beinstalled to have a zero degree tilt, but will be able to be remotely adjusted to different degrees<strong>of</strong> tilt, without the need to climb the monopole <strong>for</strong> such adjustments.3.1.3 Power SupplyThe supply to the Wollongong Yard power cabinet will be via an existing distribution board in theWollongong Communications Room. This will be fed from an existing metering panel via a newcircuit breaker. The BTS equipment will be installed in the Communications Room and cableswill be routed to the existing tower via an existing cable tray.3.1.4 Fibre OpticsThe nearest network access point (NAP) to the site is Wollongong Communications Room(2ATH0391) at SW83+032 which is located adjacent to the site. The BTS equipment will behoused within the Communications Room and connected to the 2ATH0391 ODF patch pointsvia 2 x six core pre-terminated cables. Fibres will be spliced with the RailCorp Bearer Networkat 2ATH0391. RailCorp is to carryout patching at the NAP.Page 23 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!