12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Principal(g) Obstruction or risks to pedestrians orvehicles caused by the location <strong>of</strong> the facility,construction activity or materials used inconstruction are to be mitigated.ProposalConstruction activities will take place in the railcorridor and changes to traffic and access arenot expected.Any traffic changes will be implemented inaccordance with an approved TrafficManagement PlanThere will be no risks to traffic or pedestriansduring the operation <strong>of</strong> the proposal.(h) Where practical, work is to be carried outduring times that cause minimum disruption toadjoining properties and public access. Hours<strong>of</strong> work are to be restricted to between 7.00amand 6.00pm, Mondays to Saturdays, with nowork on Sundays and public holidays.(i) Traffic control measures are to be takenduring construction in accordance withAustralian Standard AS1742.3-2002 Manual <strong>of</strong>uni<strong>for</strong>m traffic control devices – Traffic controldevices on roads.(j) Open trenching should be guarded inaccordance with Australian Standard Section93.080 – Road Engineering AS1165 – 1982 –Traffic hazard warning lamps.(k) Disturbance to flora and fauna should beminimised and the land is to be restored to acondition that is similar to its condition be<strong>for</strong>ethe work was carried out.(l) The likelihood <strong>of</strong> impacting on threatenedspecies and communities should be identifiedin consultation with relevant state or localWhere possible, all work associated with thedevelopment and installation <strong>of</strong> the between7.00am and 6.00pm, Mondays to Fridays and8.00am to 1.00pm Saturdays, with no work onSundays and public holidays, however workmay be undertaken during scheduledpossessions.A Traffic Management Plan will be developedand implemented during construction andinstallation activities. The procedures andmitigation measures in the plan will ensurecompliance with Australian StandardAS1742.3-2002 Manual <strong>of</strong> uni<strong>for</strong>m trafficcontrol devices – Traffic control devices onroads (refer Section 4.14).No trenching will be required as part <strong>of</strong> theproposed works.Tree removal is not proposed as part <strong>of</strong> theworks. However, should construction requirethe removal <strong>of</strong> any trees, suitable replantingwill be undertaken upon completion <strong>of</strong> theinstallation activities (refer Section 4.4).The proposed activities do not require theremoval <strong>of</strong> significant amounts <strong>of</strong> vegetation.A search <strong>of</strong> threatened species has beenPage 60 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!