12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Safety Agency (ARPANSA). It is to show thepredicted levels <strong>of</strong> electromagnetic energysurrounding the development comply withthe safety limits imposed by the AustralianCommunications and Media Authority andthe Electromagnetic Radiation Standard, anddemonstrate compliance with the MobilePhone Networks Code.Principle 4: Minimise disturbance and risk, and maximise compliancePrincipal(a) The siting and height <strong>of</strong> anytelecommunications facility must comply withany relevant site and height requirementsspecified by the Civil Aviation Regulations1988 and the Airports (Protection <strong>of</strong> Airspace)Regulations 1996 <strong>of</strong> the Commonwealth. Itmust not penetrate any obstacle limitationsurface shown on any relevant ObstacleLimitation Surface Plan that has beenprepared by the operator <strong>of</strong> an aerodrome orairport operating within 30 kilometres <strong>of</strong> theproposed development and reported to theCivil Aviation Safety Authority Australia.(b) The telecommunications facility is not tocause adverse radio frequency interferencewith any airport, port or CommonwealthDefence navigational or communicationsequipment, including the MorundahCommunication Facility, Riverina.(c) The telecommunications facility andancillary facilities are to be carried out inaccordance with the applicable specifications(if any) <strong>of</strong> the manufacturers <strong>for</strong> the installation<strong>of</strong> such equipment.ProposalThe provisions <strong>of</strong> the Civil AviationRegulations 1988 and the Airports (Protection<strong>of</strong> Airspace) Regulations 1996 wereconsidered during the design and sitingprocess. There is no need <strong>for</strong> the installation<strong>of</strong> a warning light or aircraft navigation light, asthe proposal does not penetrate the ObstacleLimitation Surface.RailCorp will operate the radio facility with itsown spectrum and the facility will not causeany interference with other networks. All radiotransmitters will use the frequency assigned toRailCorp <strong>for</strong> the exclusive use <strong>of</strong> RailCorp.The installation and operation <strong>of</strong> the radioequipment and antennas will be carried out inaccordance with the manufacturers’specifications.Page 58 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!