12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Any spoil or waste material tracked onto roads will be swept up immediately.• Adequate numbers <strong>of</strong> bins and waste containers will be placed at the site. The site managerwill ensure bins are not overflowing and are appropriately covered.• All waste will be removed from the site when work is completed.4.8 Contaminated LandExisting SituationThe site has been investigated <strong>for</strong> potential land contamination. The investigation included:• a visual inspection <strong>for</strong> signs <strong>of</strong> potential land contamination;• a search <strong>of</strong> the <strong>NSW</strong> Office <strong>of</strong> Environment and Heritage (OEH) register <strong>of</strong>contaminated sites;• a search <strong>of</strong> RailCorp records; and• a review <strong>of</strong> all materials to be used at the site to establish their potential <strong>for</strong> landcontamination.The initial investigation did not find any signs <strong>of</strong> potential land contamination, other than thosetypically associated with rail corridors. There are no visible and/or obvious signs <strong>of</strong>contamination in the vicinity <strong>of</strong> the site. No waste dumping, soil discoloration, odours and/orsimilar were noticed.RailCorp does not have any record or evidence that the site is contaminated. The closest siteon the OEH list is BHP Area 21 at Springhill Road, about 2.5 kilometres away.Hazardous materials will not be used during construction and operation and, there<strong>for</strong>e, theproposed work will not result in any new site contamination.Potential ImpactIt is highly unlikely that the site can be contaminated by known activities or by contaminantsmigrating from known contaminated sites.However, the limited investigation cannot exclude potential contamination as the result <strong>of</strong>unknown past activities, either on the site or in the vicinity.As intrusive works are not proposed, there is minimal risk that contaminants could beencountered during the proposed work.Risk Management and Possible ControlsAs no intrusive works are proposed, no control measures are required.Page 37 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!