12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.18 Cumulative <strong>Environmental</strong> EffectsCumulative impacts <strong>of</strong>ten result when several different construction projects are scheduled <strong>for</strong>similar times and locations.A search <strong>of</strong> the Department <strong>of</strong> Planning’s Major Projects register was undertaken on 15February 2012. There are several major projects in the vicinity <strong>of</strong> the site including atWollongong Hospital and redevelopment on Keira Street. A search <strong>of</strong> major developmentapplications around the area currently on exhibition and recently determined was undertaken on15 February 2012 and did not identify any large projects nearby that might be constructed at asimilar time.There is also a risk <strong>of</strong> cumulative impacts if unscheduled work, e.g. emergency work by otherutilities or developers, is required. Such situations will be monitored and addressed by theProject Manager.The Wollongong Yard BTS site is one <strong>of</strong> a large number <strong>of</strong> radio communications facilities beinginstalled across RailCorp’s electrified network as part <strong>of</strong> the DTRS project. In terms <strong>of</strong> localisedcumulative construction impacts, the nearest construction <strong>for</strong> the DTRS project will be at theConiston site, which is about 1.4 kilometres south <strong>of</strong> the proposed site. Even if both facilitieswere constructed simultaneously, it is not likely cumulative noise or local traffic impacts willresult.Overall this work, as part <strong>of</strong> the DTRS project, will result in significant benefits by providing amore effective communications systems <strong>for</strong> the RailCorp network. The GSM-R system is in usearound the world and allows <strong>for</strong> continuous communications coverage, the capacity to makesimultaneous calls and greatly improved emergency calling capabilities. Once active, the DTRSwill provide a more effective communications system that will assist in the safe and efficientoperation <strong>of</strong> RailCorp’s electrified rail network.Proposed Control Measures• Any other major development or works planned in the vicinity <strong>of</strong> the site will be investigatedbe<strong>for</strong>e construction begins.• Consultation with Wollongong City Council and any other relevant stakeholders regardingother developments will be undertaken on an ongoing basis.4.19 Consideration <strong>of</strong> Clause 228 <strong>of</strong> EP&A Regulations andEPBC ActClause 228 <strong>Factors</strong>Clause 228(2) <strong>of</strong> the EP&A Regulation 2000 details those factors that must be taken intoaccount when consideration is being given to the likely impact <strong>of</strong> an activity on the environment.Table 3 provides a summary <strong>of</strong> how each <strong>of</strong> these factors has been considered.Page 44 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!