12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• It operates on a spectrum <strong>of</strong> 1800 MHz which was available <strong>for</strong> purchase by RailCorp. Theother options would have required the leasing <strong>of</strong> a radio spectrum from atelecommunications licence holder.• It is a scalable network that can grow in step with RailCorp operations and network.• It is compatible with the Australian Rail Track Corporation’s communication system.• It provides a plat<strong>for</strong>m <strong>for</strong> future enhancements and increased operational safety, including aLevel 2 Automatic Train Protection (ATP) System, as per the recommendations <strong>of</strong> theWaterfall inquiry.• It will deliver the best value <strong>for</strong> money solution with the least risk.3.5 Alternatives to the Wollongong Yard SiteThe following options were considered <strong>for</strong> the development <strong>of</strong> the Wollongong Yard site:• to do nothing; or• install a new BTS, elsewhere in the Wollongong area.The do nothing option was rejected <strong>for</strong> the reasons listed below.• The inability to meet the requirement <strong>of</strong> 100% network coverage.• A ‘black spot’ in the DTRS network, resulting in a significant safety issue in the event <strong>of</strong> anemergency call or a train incident.• The increasing maintenance costs <strong>of</strong> the MetroNet facility and the limited reliability <strong>for</strong>adequate operation <strong>for</strong> the next 10 – 15 years.Radio frequency modelling indicated that a new BTS installed elsewhere in the Wollongongarea would not provide adequate coverage to the rail corridor. A second site would then berequired, increasing costs and environmental risks.3.6 Justification <strong>of</strong> the Preferred OptionOverall this work, as part <strong>of</strong> the DTRS project, will result in significant benefits by providing amore effective communications systems <strong>for</strong> the RailCorp network. The system is in use aroundthe world and allows <strong>for</strong> continuous communications coverage, the capacity to makesimultaneous calls and greatly improved emergency calling capabilities. Once active, the DTRSwill provide a more effective communications system that will assist in the safe and efficientoperation <strong>of</strong> RailCorp’s electrified rail network.It was decided to construct a BTS adjacent to Wollongong railway station because it will enablethe site to be consistent with the whole RailCorp DTRS network. Consistent technology choicewill enable RailCorp to improve its existing quality <strong>of</strong> service, reliability and emergencyresponsiveness. The reasons <strong>for</strong> selecting the technology are discussed above.Page 27 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!