12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Land UseNo specific control measures are required.Socio-Economic Effects• Nearby residents and businesses will be in<strong>for</strong>med about the nature and timing <strong>of</strong>works.• Signage will notify the public <strong>of</strong> the works.• Appropriate fencing around the site will help maintain public safety during construction andoperation.Electromagnetic Energy (EME)• Appropriate signage will be placed around the site to warn people <strong>of</strong> the potentialhazards.• All people required to work around occupationally hazardous radio frequencies willundergo RadHaz training.Traffic and Access• A Traffic Management Plan will be developed <strong>for</strong> the site.• Limit the number <strong>of</strong> car spaces unavailable during work.• Car park users will be advised <strong>of</strong> any upcoming parking changes via signage and thenumber <strong>of</strong> car spaces unavailable during construction will be minimised.• The Traffic Management Plan will ensure compliance with Australian StandardAS1742.3-2002 Manual <strong>of</strong> uni<strong>for</strong>m traffic control devices – traffic control devices onroads.Utilities and ServicesNo specific control measures are required.Light SpillPage 50 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!