12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

As few vehicle movements will be required as part <strong>of</strong> the proposed works, access changes tolocal roads or access to driveways are not expected.There will be some traffic movement associated with vehicles that will need to access the site<strong>for</strong> maintenance requirements. However, the volume <strong>of</strong> traffic will be very small and will notadversely impact on the surrounding road network. It is proposed that the mast and antennasbe accessed via an elevated work plat<strong>for</strong>m or through the use <strong>of</strong> a ladder and dual lanyardsystem.Possible Control MeasuresImpacts associated with traffic and access will be minimised through a range <strong>of</strong> controlmeasures, which may include, but will not be limited to those outlined below.• A Traffic Management Plan will be developed <strong>for</strong> the site.• Limit the number <strong>of</strong> car spaces unavailable during work.• Car park users will be advised <strong>of</strong> any upcoming parking changes via signage.• The Traffic Management Plan will ensure compliance with Australian Standard AS1742.3-2002 Manual <strong>of</strong> uni<strong>for</strong>m traffic control devices – traffic control devices on roads.4.15 Utilities and ServicesExisting SituationThere is expected to be a number <strong>of</strong> existing services such as electricity, fibre and sewer closeto the proposed site.Potential ImpactsThe facility will be connected to the existing electricity supply and fibre network and does notrequire connections to water or gas. RailCorp has an existing metered power supply and willcontinue to use this supply. No overhead wires will need to be relocated.There are a number <strong>of</strong> public utilities near the site however there is no potential <strong>for</strong> undergroundservices to be impacted as no intrusive works are proposed.Possible Control MeasuresNo specific control measures are required.4.16 Light SpillLight spill impacts will not occur as night works are not proposed. In addition, there is no newpermanent lighting proposed. No further consideration <strong>of</strong> light spill is considered necessary.4.17 Demand on ResourcesConstruction materials are readily available and will be sourced from local contractors wherepossible.Page 43 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!