12.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Principal(d) The telecommunications facility is not toaffect the structural integrity <strong>of</strong> any building onwhich it is erected.(e) The telecommunications facility is to beerected wholly within the boundaries <strong>of</strong> aproperty where the landowner has agreed tothe facility being located on the land.(f) The carrying out <strong>of</strong> construction <strong>of</strong> thetelecommunications facilities must be inaccordance with all relevant regulations <strong>of</strong> theBlue Book – ‘Managing Urban Storm water:Soils and Construction’ (Landcom 2004), or itsreplacement.ProposalThe proposed facility will not be connected toan existing building.The proposed facility will be inside the railcorridor that is owned and used by RailCorp.RailCorp is the proponent <strong>of</strong> the network andagrees to the use <strong>of</strong> the land <strong>for</strong> the proposedradio equipment.As no intrusive works are proposed, noerosion or sedimentation controls arerequired.Page 59 <strong>of</strong> 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!