12.07.2015 Views

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 128 / 295Document ID.No.UKEPR-0002-162 Issue 04SUB-SECTION <strong>16.2</strong>.2.3 - FIGURE 8Hydrogen and steam concentration history for a 5 cm (20 cm 2 ) SB(LOCA) cold leg p.c.with delayed depressurisation, with and without spraying after 8000 s [Ref]Start of spraying

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!