SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 36 / 295Document ID.No.UKEPR-0002-162 Issue 04• manual depressurisation of the RCP [RCS]: the severe accident criterion foropening the severe accident relief valve is reached at approximately 3 hours20 minutes.The total loss of feedwater scenario differs from the above LOOP only in that the automaticshut down does not occur at time t = 0 seconds but is initiated on the low SG level criterionand the shutdown of the primary pumps on the very low SG level. Due to the higher quantityof energy transmitted to the RCP [RCS], SG dryout occurs earlier.2.1.1.2.3.2. Shutdown ConditionsShutdown conditions have only been examined for LOOP scenarios, with different levels ofdecay heat, with or without the availability of accumulators and two levels of RCP [RCS]water (full and mid-loop).From a phenomenological point of view, these scenarios are representative of many otherscenarios, such as those with the loss of coolant.Three reactor conditions have been analysed:• B: hot shutdown, RHR not connected, RCP [RCS] full of water, RCP [RCS]closed.• C: intermediate cold shutdown, RHR connected, RCS level at mid-loop, SGpressure at 1 bar.• D: cold shutdown, RHR connected, RCP [RCS] level at mid-loop, SG pressure at1 bar.Condition C is subdivided into two subsidiary conditions, Ca and Cb.Condition Ca is characterised by:• an RCP [RCS] full of water (nominal level) and closed,• a primary pressure between 1 bar and 25 bar,• a primary temperature between 55°C and 120°C.For all calculations, the initiating event occurs 6 hours (time 0 on the MAAP calculation) afterthe reactor scram with a primary pressure of 25 bar and a primary temperature of 120°C.Condition Cb is characterised by:• a mid-loop level of RCP [RCS],• a primary pressure of 1 bar,• a primary temperature of 55°C.For all calculations (conditions Ca and Cb) the following assumptions have been adopted:• the RHR is lost,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!