SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTPAGE : 267 / 295CHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESDocument ID.No.UKEPR-0002-162 Issue 04SECTION <strong>16.2</strong>.3 - FIGURE 12Direct contamination of leafy vegetables (Bq/kg) by Sr90 and Sr89+Sr90 which is notexceeded beyond the given affected area immediately after the accident1E+51E+4Sr89+Sr901E+3General EUTrading Limit1E+2Bq/kgSr901E+11E+01E-11E-21E-2 1E-1 1E+0 1E+1 1E+2 1E+3 1E+4Affected Area(sqkm)