12.07.2015 Views

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 218 / 295Document ID.No.UKEPR-0002-162 Issue 04SUB-SECTION <strong>16.2</strong>.2.5 - TABLE 13LOOP sequence of events for ex-vessel phase [Ref]CONCERNEDLOCATIONKEY EVENTSTIMEReactor pitCore catcherStart of MCCI in the reactor pit afterinitial vessel failureEnd of MCCI in reactor pitArrival of the melt in the corecatcherInitiation of flooding of bottomcooling systemStart of core melt quenching in thecore catcher (time delay 300 s) withsteam production of 100 kg/sEnd of MCCI in core catcher(sacrificial concrete is consumed)End of steam production due tocore melt quenchingStart of filling of the core catcherwith sub-cooled water from theIRWSTEnd of fill–up phase (waterinventory of 450 x 10 3 kg reached)Start of boiling and steamproduction due to decay heat8 h 26 min 30360 s10 h 40 min 38400 s10 h 45 min 38700 s12 h 18 min 44300 s11 h 08 min 40100 s12 h 30 min 45000 s15 h 16 min 55000 s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!