12.07.2015 Views

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 212 / 295Document ID.No.UKEPR-0002-162 Issue 04SUB-SECTION <strong>16.2</strong>.2.5 - TABLE 7LB(LOCA) pressure of selected times(Data derived from the analysis results presented inSub-section <strong>16.2</strong>.2.5 – Figures 2, 7 and 12)Blowdown pressurepeakPressure at end ofin-vessel phaseQuench peak(flooding of coremelt in corecatcher)Pressure decreaseuntil boiling starts inthe core catcherPressure at start ofEVU [CHRS]operationPressure after22.2 hoursPressure increaserate at 22.2 hoursTime[s]Pressure withEVU [CHRS](2 trains)[bar]Pressure withoutEVU [CHRS][bar]100 3.5 3.510680 2.2 2.219300 4.8 4.833000 2.6 2.644700 3.4 3.480000 2.0 4.780000 -0.02 [bar/h] 0.12 [bar/h]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!