12.07.2015 Views

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 211 / 295Document ID.No.UKEPR-0002-162 Issue 04SUB-SECTION <strong>16.2</strong>.2.5 - TABLE 6LB(LOCA) sequence of events for ex-vessel phase [Ref]LOCATION KEY EVENTS TIMEReactor pitCore catcherStart of MCCI in the reactor pit afterinitial vessel failureEnd of MCCI in reactor pitArrival of the melt in the corecatcherInitiation of flooding of bottomcooling systemStart of core melt quenching in thecore catcher (time delay 300 s) withsteam production of 100 kg/sEnd of MCCI in core catcher(sacrificial concrete is consumed)End of steam production due tocore melt quenchingStart of filling of the core catcherwith sub-cooled water from theIRWSTEnd of fill–up phase (waterinventory of 450 x 10 3 kg reached)Start of boiling and steamproduction due to decay heat2 h 58 min 10680 s4 h 51 min 40 s 17500 s4 h 56 min 40 s 17800 s6 h 16 min 40 s 22600 s5 h 21 min 40 s 19300 s6 h 56 min 40 s 25000 s8 h 53 min 20 s 33000 s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!