12.07.2015 Views

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 217 / 295Document ID.No.UKEPR-0002-162 Issue 04SUB-SECTION <strong>16.2</strong>.2.5 - TABLE 12LOOP sequence of events for in-vessel phase(Data inferred from the information given in section 2.1)KEY EVENTSTIMEReactor Coolant Pump run down 0 h 00 min 0 sReactor scram 0 h 00 min 0 sAffected SG dry 2 h 06 min 7560 sQuench tank disk rupture 2 h 12 min 7920 sCore uncovery 2 h 55 min 10500 sAccumulator injection start 3 h 19 min 11940 sAccumulator depletion 3 h 31 min 12660 sSA dedicated PZR valve opening 3 h 10 min 11400 sOnset of oxidation 4 h 33 min 16380 sStart of core melting 4 h 41 min 16860 sStart of core relocation to lowerhead7 h 23 min 26580 sRPV failure 8 h 26 min 30360 s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!