12.07.2015 Views

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

16.2 - Severe Accident Analysis (RRC-B) - EDF Hinkley Point

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUB-CHAPTER : <strong>16.2</strong>PRE-CONSTRUCTION SAFETY REPORTCHAPTER 16: RISK REDUCTION AND SEVEREACCIDENT ANALYSESPAGE : 214 / 295Document ID.No.UKEPR-0002-162 Issue 04SUB-SECTION <strong>16.2</strong>.2.5 - TABLE 9SB(LOCA) sequence of events for in-vessel phase(Data inferred from the information given in section 2.1)KEY EVENTSTIMEReactor scram 0 h 00 min 120 sStart of Partial Cooldown 0 h 04 min 240 sReactor Coolant Pump run down 0 h 09 min 540 sStart of Fast Cooldown 0 h 31 min 1860 sAccumulator injection start 0 h 32 min 1900 sAccumulator water depletion 0 h 33 min 1980 sCore uncovery 39 h 17 min 141420 sOnset of oxidation 40 h 50 min 147000 sSA dedicated PZR valve opening 40 h 20 min 145200 sStart of core melting 40 h 56 min 147360 sStart of core relocation to lowerhead46 h 12 min 166320 sRPV failure 46 h 52 min 168700 s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!