12.07.2015 Views

Installation Instructions for a “Pair” of gates...

Installation Instructions for a “Pair” of gates...

Installation Instructions for a “Pair” of gates...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ONOFF1 2 35. SELECT DIPSWITCHES 1 & 2 OFF FORCOMMISSIONING6. ENSURE HARD WIRE LINK IS FITTEDBETWEEN TERMINALS 1 & 2 AND2 & C110 11 S 1 2 3 3P 4 5 7 2 C1 CX B1 B23.2 - Opening & Closing the GatesL1 L2 U V W X Y E1 10 11 1 2 3 5 7 C11. MOMENTARILY PULSE TERMINALS2 & 3 WITH A PIECE OF WIRETRAILING FROM TERMINAL 2 ANDMOMENTARILY TOUCHINGTERMINAL 3.THE GATES SHOULD START TOOPEN. IF THEY START TO CLOSETURN THE POWER OFF TO THECONTROL PANEL AND CHANGEAROUND EITHER U-V (MOTOR 1) ORX-Y (MOTOR 2) TO CHANGETHE MOTOR DIRECTION.L1 L2 U V W X Y E1 10 11 1 2 3 5 7 C12. ONCE YOU HAVE PROVED THEMOTOR DIRECTION USETERMINALS 2 & 7 TO OPEN ANDCLOSE THE GATES WITH ATRAILING WIRE ONCE AGAIN INTOTERMINAL 2, MOMENTARILYTOUCHING TERMINAL 7.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!