12.07.2015 Views

Installation Instructions for a “Pair” of gates...

Installation Instructions for a “Pair” of gates...

Installation Instructions for a “Pair” of gates...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STAGE 1CIVIL & MECHANICAL SECTION1.1 - <strong>Installation</strong> <strong>of</strong> Foundation CasingsTHE UNDERGROUND CASING SHOULD BE CONCRETED IN THE GROUND. THE CASINGSHOULD HAVE ADEQUATE DRAINAGE TO A SUITABLE SOAK AWAY. WHEN INSTALLING THEFOUNDATION CASING AS A GUIDE ALLOW APPROXIMATELY 100MM AROUND THE CASINGAND 100MM UNDERNEATH THE CASTING FOR CONCRETE.DUCTING FORMOTOR WIRESHEEL OF CASINGSOAK AWAYWHEN CONCRETING THE CASING IN PLACE, ENSURE THAT THE HEEL OF THE CASING ISPACKED WITH CONCRETE AS THIS WHERE ALL OF THE WEIGHT OF THE GATE WILL SIT.ALLOW AT LEAST TWO DAYS FOR THE CONCRETE TO GO OFF.WHEN SETTING THE CASING IN PLACE ENSURE THAT THE TOP HINGE PIN IS PLUMB INLINE WITH THE HINGE PIVOT IN THE CASING. THE CENTRE OF PIVOT IS 65mm STANDOFFFROM THE BACK OF THE CASING. THE CASING SHOULD BE SET PERFECTLY SQUAREAND LEVEL AND PROTRUDING APPROXIMATELY 3MM FROM GROUND LEVEL.WHEN CONCRETING THE CENTRE STOP IN PLACE ENSURE THAT IT DOES NOT PROTRUDEMORE THAN 65mm TO 70mm FROM GROUND LEVEL ANYMORE AND IT MAY DAMAGE THEUNDERSIDE OF LOW VEHICLES.67mm67mm3mm67mm67mm160mm160mm100mm 60mm3mm100mm60mm3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!