13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3 Description <strong>of</strong> the Proposal3.1 Scope <strong>of</strong> Proposed Works3.1.1 SummaryThe outdoor BTS site at Fairy Meadow will consist <strong>of</strong> the following components:• a 20 metre high monopole;• a 1.5 metre high lightning rod at the apex;• two Argus panel antennas mounted on the monopole;• power and BTS cabinets located on a slab adjacent to the monopole;• Electrical power distribution from a new street supply; and• fibre optic cable connection into a new RailCorp pit at SW79+774 which will then run to existing pit2ATP04281 via a new under line crossing.These components are described in the sections below. Plan drawings are provided in Appendix 2. All aspects<strong>of</strong> the proposal will be earthed in line with all relevant standards.3.1.2 BTS SiteBTS CabinetThe BTS cabinet will be placed on a precast concrete slab adjacent to the power cabinet (described below) andwill be oriented to the north-west. The cabinet will be stainless steel, approximately 1700 millimetres high by1000 millimetres long by 880 millimetres wide, and will be placed on a steel plinth with a minimum height <strong>of</strong> 200millimetres to allow <strong>for</strong> the management <strong>of</strong> cables entering the cabinet. The cabinet will be powered via thepower cabinet described below.The BTS cabinet will include the following equipment:• BTS equipment (transceiver modules, transmission equipment, controller etc);• DC distribution (including EMI filter and surge protection);• transmission interface (Huawei PTN910);• fibre optic distribution frame;• 6 ethernet ports (gigabit optical interface) <strong>for</strong> RailCorp’s use;• monitoring and reporting capability <strong>of</strong> power cabinet conditions;• a suite <strong>of</strong> alarms which include open doors, high temp, power failure and low battery alarm; and• field monitoring device <strong>for</strong> radio frequency coverage. This requires a 12V DC input so is installed with a48V to 12V DC power converter.Page 21 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!