13.07.2015 Views

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

Review of Environmental Factors - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Discom<strong>for</strong>t effects are not expected given the types <strong>of</strong> machinery required <strong>for</strong> construction works. Similarly,structural damage to buildings is not expected as the nearest buildings are adjacent to the railway and alreadyexperience vibration from trains on a regular basis.Operational Noise and VibrationNo operational impacts are expected.Possible Control MeasuresConstruction works will adopt Best Management Practice (BMP) and Best Available Technology EconomicallyAchievable (BATEA) practices as described in the Interim Construction Noise Guideline (ICNG) (DECC 2009).In addition to the control measures listed in Table 2, the community will be notified <strong>of</strong> the works, duration andprovided with contact details be<strong>for</strong>e work begins. Any noise complaints received will be addressed by theProject Manager as soon as possible.Table 2Possible Construction Noise Control MeasuresPossible Construction NoiseControl MeasuresConstruction Noise Control Measures to beimplemented during constructionMaximising the <strong>of</strong>fset distancebetween noisy plant items andnearby residential receiversAvoid the simultaneousoperation <strong>of</strong> two or more noisyplant items in close vicinity andadjacent to residentialreceiversSchedule the noisiest activitiesduring normal business hours(7am and 6pm Monday toFriday and 8am and 1pmSaturday), or where this is notpossible, to less sensitivetimes <strong>of</strong> dayYesNoYesNoYesNoThe nearest residential receivers are 125 metresaway.Ef<strong>for</strong>ts will be made to minimise the simultaneousoperation <strong>of</strong> noisy plant and equipment.Construction will take place during standard workinghours.Provide periods <strong>of</strong> quiet if Yesactivities occur <strong>for</strong> extendedperiods during the night No Not applicable as night works are not proposed.Minimise consecutive night Yestime activities in the samelocality No Not applicable as night works are not proposed.Orient equipment away fromresidential receiversYesNoEf<strong>for</strong>ts will be made to orient equipment away fromresidential receivers.Page 35 <strong>of</strong> 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!